ARISS Next Generation Radio System Completes Critical Flight Certification Tests
The Interoperable Radio System (IORS), ARISS’ next generation radio system successfully completed a battery of stressful tests required as part of the final certification of the hardware for launch to and operation on the International Space Station.
Kerry Banke states, “Since the IORS is being qualified to operate on 120VDC, 28VDC and Russian 28VDC as well as transmitting on VHF or UHF, a lot of test combinations were required to cover all cases. Each input voltage type was also tested at low, medium and high line voltage. Moreover, additional permutations were required to test the IORS under no load, medium load and full load at each voltage level. So it should not be surprising why the tests took two weeks to complete.”
Successful completion of these tests represents a key milestone in preparing the IORS for launch. ARISS can now begin final assembly of the flight safety certification in preparation for launch. ARISS is working towards launch ready status by the end of the year.
m5aka
AMSAT-UK
Powered by WPeMatico